The 280-meter Diana Bridge is a multi-span, prestressed concrete I-girder bridge. It will connect Samtse Dzongkhag headquarters to nine of the Dzongkhag’s gewogs via the Samtse-Tashichholing Secondary National Highway. Designed with a load capacity of 70 tonnes, it replaces a 300-meter Bailey bridge that had been operating at a reduced capacity. The construction of the Diana Bridge was completed 16 months ahead of its original schedule, marking a significant engineering accomplishment for the nation.

  • Client Name:
    MoIT
  • Contracter Name:
    Rigsar Construction
  • Funded By:
    GoI
  • Location:
    Norbugang on Samtse – Sipsu SNH
  • Contract Amount:
    Nu. 196,806,008.24
  • Contract Duration:
    25 Months. 16months ahead
  • Status:
    Completed