The project includes the construction of a 493-meter four-lane road along with an RCC (Reinforced Cement Concrete) roadside drain and footpath. Key features include a major underpass, 40 meters in length and 8 meters wide, with RCC retaining walls along the approach road. Additionally, the project involves the construction of four service roads—two measuring 152 meters each and two measuring 268 meters each, all 4 meters wide. Other construction activities include the realignment of water supply and sewerage lines, rebuilding boundary walls, and installing street light lamp posts along the road corridors.

  • Client Name:
    Phuntsholing Thromde
  • Contracter Name:
    M/S. MARUSHIN SHITAKA - M/S RIGSAR (JV)
  • Funded By:
    ADB
  • Location:
    Phuntsholing
  • Contract Amount:
    198,408,767
  • Contract Duration:
    29 Months
  • Status:
    Completed