Media Gallery

Detail Design & Construction of Khuru Khuenphen Bridge at khuruthang, Punakha on Bajo-Khuru Secondary National Highway

  • Client Name:
    Department of Surface Transport, Ministry of Infrastructure and Transport
  • Contracter Name:
    Rigsar Construction Pvt. Ltd.
  • Funded By:
    Government of India
  • Location:
    Khuruthang, Punakha
  • Contract Amount:
    Detail Design works (Phase I): Nu. 9,970,260.00 Construction of the Bridge (Phase II): Nu.220,304,639.48
  • Contract Duration:
    32 Months
  • Status:
    In Progress

Let's get started